Today@Dal
» Go to news mainMedjuck and DaCosta row Roadway Paving Repairs
Posted by Faculty of Engineering on
June 23, 2021
in
General Announcements
Foot and vehicle traffic on Sexton campus should be aware of upcoming upgrades to curbs, roads, and sidewalks on the Sexton campus from JuneÌý23 to July 30. The affected area includes DaCosta row (between the roundabout and the intersection with Norma Eddy Lane) and the footpaths in front of the Medjuck building.
​If there are questions or concerns, please contact Liane Sandula atÌýLiane.Sandula@dal.ca
Ìý
Recent News
- McCall MacBain Scholarship info session
- Seeking youth 9‑15 for clinical trial of CMV vaccine
- In Memoriam: Dr. Philip Welch
- Guidance for use of generative A.I. tools in research
- 5th annual Employee Wellness Day
- Job postings
- Dal Bookstore celebrates African Heritage Month with local Black‑owned brands and inspiring literature
- Karaoke and Open Mic Night at The Social