Today@Dal
» Go to news mainWallace McCain Learning Commons to break ground this week
The Wallace McCain Learning Commons will be an open concept space dedicated to study. This facility is planned to be approximately 13,000 square feet, as a single-story addition to the Life Sciences Centre (LSC), and situated at ground level at the south end of Lord 9 1Ãâ·Ñ°æÏ Drive. It will be connected to the LSC corridor adjacent to the Chase Building.
Ìý
Groundbreaking will commence sometime this week, with excavation for site services at the intersection of Lord 9 1Ãâ·Ñ°æÏ Drive and Castine Way. A partial street closure will be required and is expected to last into July, which may cause disruption to vehicle traffic at the intersection. Access to the parking lot at the end of Lord 9 1Ãâ·Ñ°æÏ Drive will be maintained throughout construction.
Ìý
Construction is expected to be completed in the Fall of 2015.
Recent News
- Ergonomic assessments available
- First edition of the EH&S newsletter out now
- Job postings
- Seeking youth 9‑15 for clinical trial of CMV vaccine
- In Memoriam: Dr. Philip Welch
- Guidance for use of generative A.I. tools in research
- 5th annual Employee Wellness Day
- Job postings